Glider Maintenance Programme Report. (BGA 267) Work pack file ref: Page No: Total pages in pack: Registration G- BGA No. Type. Serial No. For Task description, refer to BGA GMP (Except for the signature, this form may be completed electronically) TASK NO DESCRIPTION TASK COMPLETED INITIALS TASK NO DESCRIPTION Tasks 1 to 62 all aircraft (Mark not applicable items N/A) 40 Tail plane and elevator TASK COMPLETED INITIALS 1 Fuselage paint/gel coat 41 Left wing 2 Fuselage structure 42 Left wing aileron & controls 3 Nose fairing 43 Left air brake/spoiler 4 Rudder 44 Left flap 5 Pot pitot / ventilator 45 Right wing 6 Centre section fairing 46 Right wing aileron & controls 7 Wing attachments 47 Right air brake/spoiler 8 Canopy, locks & jettison 48 Right flap 9 Seat / cockpit floor 49 Bonding/vents/drains 10 Cleanliness/loose article check 50 Lubrication 11 Front skid / nose wheel & mounts 12 Main wheel & brake assembly 13 U/C suspension 14 U/C retract system and doors 15 Tail skid/wheel 16 Release hook(s) 17 Harness (es) 18 Rudder pedal assemblies 19 Rudder control circuit/stops 20 Elevator control circuit/stops 21 Aileron control circuit/stops 22 Trimmer control circuit 23 Air brake control circuit 24 Wheel brake control circuit 25 Instrument panel assemblies 26 Pitot/static system 27 ASI calibration 28 Altimeter datum (Max error 2 Mb) 29 Electrical installation/fuses 30 Battery security & corrosion 31 Oxygen system Radio installations, placards and transponder. 32 Radio Type fitted: 51 Markings 52 Mandatory checks & AD’s completed and recorded in logbook. Manufacturers recommendations and life inspections 53 Next airframe life inspection due: Equipment & engine life checked 54 Control deflections & free play Record on worksheets 55 Duplicate inspections recorded on worksheets Weighing report accurately reflects 56 condition of aircraft Date of last weighing 57 Speed/weight/manoeuvre placard 58 Total hours (from new) 59 Total launches (from new) 60 Modifications approved 61 Log book update 62 Flight manual revision Tasks 63 to 89 applicable to Self Sustaining Sailplanes See tasks 90 to 100 for any additional items 63 Engine pylons & mountings 64 Gas strut 65 Pylon/engine stops 66 Electric actuator 67 Electrical wiring 68 Limit switches 33 Radio frequency check (4 years) (N/A for 720/760 channel radios) 34 Removable ballast 35 Colour coding of controls 36 Equipment stowed in centre section 37 Wing struts/wires 38 Drag chute & controls 39 Water ballast system 69 Fuel tank(s) 70 Fuel pipes & vents 71 Fuel cock or shut off valve 72 Fuel pumps & filters 73 Decompression valve 74 Spark plugs 75 Harnesses and Magneto 76 Propeller & Drive Belt AMP 1-3 Appendix 1 BGA 267, issue 06/13 Page 1 of 2 77 Doors 78 Safety springs 79 Extension and retraction 80 Exhaust Engine installation check. Compression test results: 81 No1 (left/front): No2 (R/Rear): 82 Lubrication 83 Engine instruments 84 Engine battery 85 Engine battery capacity test 86 Placards 87 Oil and fuel leaks Mandatory checks & AD’s completed 88 and recorded in logbook. Manufacturers recommendations and life inspections 89 Next life inspection due: 95 96 97 98 99 100 Annual check / BGA C of A anticipation Days anticipated (90 days max without loss): Expiry of new BGA C of A: Owners Details (PLEASE PRINT) Name: Address: (Annex II) Postcode: Additional tasks as applicable (enter description) 90 91 On completion of maintenance, all applicable items have been completed, all tools & extraneous items have been removed from aircraft and accounted for 92 93 94 When this form is used for a new glider acceptance check or bridging inspection as a minimum requirement the following tasks must be certified: 32,51,52,53,56,57,58,59, 60,86,88 & 89 – certify above. General condition of aircraft should be assessed and recorded in general remarks. General Remarks Date of ARC or BGA C of A expiry: Other remarks: Record identifying marks. Fin: Fuselage: Under wing: Certificate of Release to Service (please tick Annex II or EASA box) All work has been recorded in the appropriate logbook and all additional worksheets have accounted for and certified and for BGA registered gliders, I recommend the renewal of the BGA airworthiness certificate. Annex II - The work recorded above has been carried out i.a.w. BGA Airworthiness Exposition 4.9. BGA Approval No. DAI/8378/73. EASA Aircraft - Certifies that the work specified, except as otherwise specified, was carried out in accordance with Part-M and in that respect is considered ready for release to service. BGA Approval No. UK.MF.0007. (* Written signature required) Inspector Name: Signed *: Date: BGA Authorisation No: AMP 1-3 Appendix 1 BGA 267, issue 06/13 Page 2 of 2