Date 1 Total bf. 15/4/99 16/4/99 18/4/99 20/4/99 Time run Since New or Complete Overhaul 2 h m Time Run Since Top Overhaul 3 h m Cycles run Since New or Complete Overhaul 4 1234 1234 1236 1236 10 25 00 55 100 10 100 25 102 00 103 55 The work recorded below has been carried out in accordance with the requirements of the Air Navigation Order for the time being in force and in that respect the aircraft / equipment is considered fit for release to service. Particulars of Maintenance and Other Work Carried Out on the Engine Signature Authority Date 6 5 150 hour check carried out in accordance with LAMS/A/1999 issue 1. Details on file 04/AA/99 J Smith 12459 19/4/99 Total cf. CAP 399 Engine Log book CAA C of A aircraft Example AMP 2-8 B 10/02 BGA AMP Part 2, Leaflet 2-8, Appendix B, page 1